Which braced-cut module do I need?
The Braced Cuts family has three modules for a strutted excavation. All of them draw Peck’s apparent pressure envelope, give the load of every strut, size the wales and the sheeting and check the base of the cut. They differ in the ground. Pick the one that matches the ground inside the cut.
| The ground in the cut | Module |
|---|---|
| Sand, with the water table below or above the base of the cut; the base is checked against piping when the cut is dewatered | Braced cut in sand |
| Soft to stiff clay; the envelope follows the stability number, the tension crack at the first strut is checked and the base against bottom heave | Braced cut in clay |
| A sand layer over clay inside the cut, reduced to one equivalent clay by Peck’s method | Braced cut in sand over clay |
The three manuals
Each manual follows the same plan: what the module calculates, what you need before you start, a quick start, the screen, every input section by section, the choices that decide the margin, the results, the report, a worked example you can reproduce, a table of how each input changes the answer, the messages the module gives, and answers to common questions.
What each module takes, side by side
| In sand | In clay | Sand over clay | |
|---|---|---|---|
| Ground | Sand, γ and φ′ | Clay, γ and cu | Sand and clay layers |
| Envelope | Peck envelope for sand | Peck envelopes, soft to medium or stiff clay from the stability number | Equivalent clay by Peck’s method, then as in clay |
| Base check | Piping when dewatered | Bottom heave, tension crack at the first strut | Bottom heave |
A typical braced-cut design in order
- Choose the module
Pick the one that matches the ground inside the cut and open its manual for the fields.
- Describe the cut and the ground
Enter the depth and the width of the cut, the soil and the water.
- Place the struts
Give the strut levels and the spacing, or drag the struts on the drawing before Analyze.
- Choose the steel and the code
Pick the steel grades and the design code for the sheeting and the wales, then press Analyze.
- Read and report
Read the envelope, the load of every strut, the sections and the check of the base, then save a report with the cover filled in.
Frequently asked questions
How do I calculate strut loads for a braced excavation with GeoTerva?
Open the module for the ground, Braced cut in sand, Braced cut in clay or Braced cut in sand over clay. Enter the cut, the soil, the water and the strut levels, choose the steel and the code, press Analyze, and read the apparent pressure envelope and the load of every strut.
Which pressure envelope do the modules use?
Peck’s apparent pressure envelope: the one for sand in the sand module, and the soft-to-medium or the stiff clay envelope, chosen from the stability number, in the clay modules.
Which module do I use for sand over clay?
Braced cut in sand over clay. It reduces the sand above the clay to one equivalent clay by Peck’s method and then works as the clay module.
What does the base of the cut check?
The sand module checks the factor of safety against piping when the cut is dewatered. The clay modules check the factor of safety against bottom heave.
Which codes do the sections follow?
The sheeting and the wales are sized to EN 1993-1-1 or AISC 360-22; you choose the code in the module.
Can I move the struts on the drawing?
Yes, before Analyze. Drag a strut on the drawing and its level changes; each manual lists the limits.