A wall on any profile of sand and clay layers, as a cantilever or with up to four rows of inclined ground anchors. Both the short-term and the long-term scenario are run, with water at its own level on each face, a water-filled tension crack, surcharges and the earthquake. The anchors get a free length and a preliminary bond length.
You enter
- Sand and clay layers, drained or undrained
- Water on each face, surcharges
- Up to four anchor rows
- Earthquake, steel and code
You get
- Embedment by free earth support or the hinge method
- Anchor forces, free and bond lengths
- Section check, bottom heave, displacement
- Diagrams for both scenarios

The drawing and the verdict after Analyze.
