Anchored sheet pile on layered soil: embedment, anchor forces, bending moment and displacement

How a sheet-pile wall on layers of sand and clay, held by its embedment and by up to four rows of ground anchors, is designed: pressures, depth, anchor forces, the section and the movement, with the numbers of the module.

The module runs online, in your browser, on a phone, a tablet or a PC. Nothing to install, no dongle.

The Anchored sheet pile module on a phone: the wall, its anchors, the layers and the pressures after Analyze
On this page · 21 chapters
  1. 1Sheet-pile walls on layered soil
  2. 2How the wall is held
  3. 3The stresses of the ground on the two faces
  4. 4Earth pressure in a drained layer
  5. 5Earth pressure in an undrained clay
  6. 6Short term and long term
  7. 7Surcharges on the retained surface
  8. 8The net pressure diagram
  9. 9Where the margin of safety goes
  10. 10The cantilever — the toe block
  11. 11One row of anchors — free earth support
  12. 12Several rows of anchors — the hinge method
  13. 13Shear force and bending moment
  14. 14The anchors
  15. 15The seismic situation
  16. 16Verifying the sheet pile
  17. 17Bottom heave of a clay base
  18. 18The displacement of the wall
  19. 19The opening model, by the module
  20. 20What the module assumes, and what it does not do
  21. 21References
By the GeoTerva engineering teamUpdated 2026-10-1825 min readFree, no sign-up

A sheet-pile wall on layered soil, held by its embedment and up to four rows of ground anchors. This page explains, section by section, how the module builds the earth pressures of a profile of sand and clay on both faces, finds the embedment and the anchor forces by limit equilibrium, verifies the wall, and estimates how far it moves — and closes with the opening model worked through by the module's own code.

First slide of the lecture slides: Anchored sheet pile on layered soilPDF

Lecture slides

Ready-made slides for lectures and self-study

The mechanism, the derivation, the equations and the figures of this page, in teaching order. Every slide links back to its chapter.

37 slides · PDF · 1.9 MB

1Sheet-pile walls on layered soilwhat the wall does, and what this module designs

A sheet-pile wall holds up the ground on one side of an excavation. It stands by its embedment below the floor of the excavation — the dredge line — and, when the retained height is too great for that alone, by ground anchors tied back into the soil behind it (the figure below).

water, retained facewater in the excavationcritical surfaceanchor 1free lengthbond zoneanchor 2qQLDzexcavationdredge linesand (fill)claydense sandclaydense sand
The wall this module designs: a profile of sand and clay layers running down both faces, the water standing at its own level on each face, a uniform and a point load on the retained surface, and two rows of inclined ground anchors — each a free length that crosses the active wedge and a bond zone beyond the critical surface. L is the retained height, D the embedment, z the depth from the top of the wall.

Real ground is rarely one soil. A fill over a soft clay over a dense sand is the ordinary case, and each of those layers pushes on the wall and resists it in its own way: a sand through its friction, a clay through its strength, which is not the same shortly after the excavation as it is years later. This module takes such a profile as it is.

  • Up to six layers from the retained surface down the whole wall, each a sand (drained: c′, φ′) or a clay (undrained cu in the short term, drained c′, φ′ in the long term). The same layers continue below the dredge line on both faces.
  • A cantilever, or one to four rows of ground anchors, each at its own depth, spacing and inclination.
  • Water at its own level on each face; surcharges — uniform, strip and point loads; the seismic situation.
  • The results a designer needs: the embedment, the anchor forces, the bending moment and the section, the bottom heave of a clay base and the displacement of the wall.

The method is limit equilibrium: the soil is taken at its limiting active and passive states and the wall is sized so that the forces and moments on it balance with a margin of safety. It is the classical method of practice and of the source, extended layer by layer, and the report calls it by its name — limit equilibrium, preliminary sheet-pile design.

2How the wall is heldthe cantilever, one row of anchors, several rows

How the wall is held decides how its equilibrium is written. The module knows three systems (the figure below):

Cantilever — the toe blockσ4​FL5​dredge lineOne row — free earth supportFdredge lineSeveral rows — the hinge methodF1​F2​dredge line
The three support systems. Left: a cantilever rotates about a point near its toe; the reversal of the pressures there is the toe block F–σ₄. Middle: one row of anchors — the anchor a simple support, the toe free. Right: several rows — hinges at every anchor below the uppermost make the wall statically determinate.
  • A cantilever has no support but the soil. Pushed by the retained ground it rotates about a point a little above its toe: above that point the retained face is active and the excavation face passive; below it the two swap. It is economical for moderate retained heights — as a rule up to about 5 to 6 m.
  • One row of anchors near the top turns the wall into a beam on two supports: the anchor, and the passive resistance of the embedment. The toe is taken as free to move — free earth support — so the embedment follows from one moment equation about the anchor.
  • Several rows make the wall statically indeterminate. The hinge method restores determinacy by placing a hinge at every anchor below the uppermost; each span is then a simple beam and the part below the lowest anchor is designed by free earth support about it.

Depth z is measured downward from the retained ground surface, z = 0 at the top of the wall. L is the depth of the dredge line and D the embedment below it. A positive net pressure acts toward the excavation; an anchor pulls the wall back with its reaction F per metre of wall.

3The stresses of the ground on the two facesσv, u and σ′v, behind the wall and in front of it

The pressure of a soil depends on the stress it carries, and a layered, partly submerged profile needs that stress in more than one form. On each face the module keeps three stress fields: the total vertical stress σv, the pore pressure u and the effective stress σ′v = σv − u. An undrained clay is described by the first, a drained layer by the other two.

σv,b(z)=q+ΣγiΔziub(z)=γwmax(0,z−Dw)σ′v,b=σv,b−ubthe retained face (index b, behind), from the surface z = 0
σv,f(z)=γwmax(0,L−Dw,exc)+Σz>LγiΔziuf(z)=γwmax(0,z−Dw,exc)the excavation face (index f, front), soil from the dredge line z = L
Retained face — from the surface024681050100150200z (m)kPaσv,b​σ′v,b​ub​Dw​Excavation face — from the dredge line024681050100150200z (m)kPaσv,f​σ′v,f​uf​dredge line, z = LDw,exc​
The three fields on the two faces. Behind the wall (left) the column starts at the surface with the surcharge q; in front (right) the soil starts at the dredge line, and water standing in the excavation above it adds to the total but not to the effective stress.

γi is the moist unit weight of a layer above the water of its face and the saturated one below it. Two points matter:

  • The retained column carries its whole overburden below the dredge line, while the excavation column starts afresh at the dredge line. That difference is what the embedment has to balance.
  • The uniform surcharge q enters σv,b at every depth before the pressure equations, so that the tension cut-off of a cohesive layer sees it.
Unequal water levels on the two faces are taken as hydrostatic on each face: no seepage is solved. The net water pressure then pushes the wall, and the result carries the banner PRELIMINARY — SEEPAGE EFFECT NOT INCLUDED, with no PASS verdict.

4Earth pressure in a drained layerRankine with c′ and φ′, the jumps at the layer boundaries, the cut-off

A sand, and a clay in the long term, is drained: its strength is c′ + σ′ tan φ′, and the pore water carries its own pressure. The soil pressure follows Rankine for a vertical wall, level ground and no wall friction:

Ka=tan2(45°−φ′2)Kp=tan2(45°+φ′2)
pa=max(0,Kaσ′v−2c′Ka)+upp=ηp(Kpσ′v+2c′Kp)+uηp = 1, or 1/FSp when the margin is put on the passive pressure (see the section on where the margin of safety goes); the water is never factored

Each layer has its own Ka and Kp, so the pressure jumps at a layer boundary even though σ′v is continuous there. The jumps are kept exactly — they are real features of the diagram, not errors to be smoothed.

The tension cut-off

With c′ > 0 the active equation turns negative near the top of a layer: the soil would have to pull on the wall. It cannot, so the soil part is clipped at zero — never carried as suction — while the water part is left untouched. Every depth where a clipped pressure passes through zero is kept as an event of the diagram, so the diagram bends there exactly.

Below the rotation point of a cantilever the faces swap: the retained face turns passive and the excavation face active. The same equations serve, each with the fields of its own face.

5Earth pressure in an undrained claytotal stress, σv ∓ 2cu, and the water-filled tension crack

A saturated clay loaded quickly — as by the excavation in front of it — cannot drain. Its strength is the undrained shear strength cu, with φ = 0, and it is described in total stress: the water is inside σv.

pa=max(σv−2cu,u)pp=ηp(σv+2cu)Ka = Kp = 1 at φ = 0
Never add u to an undrained clay. σv already contains the weight of its water; adding u again would count the water twice.

The tension crack

Near the top of a retained clay σv − 2cu is negative: the clay stands by itself and would pull on the wall. It does not pull — it cracks, from the top zt of the tension zone to its foot zc, where σv = 2cu (the figure below). A crack open to the surface fills with rain or ground water, and a water-filled crack pushes on the wall with its own hydrostatic pressure:

pcrack=γw(z−zt)zt≤z≤zczt the top of the crack, or the water table where it stands higher
σv​ − 2cu​γw​(z − zt​) — the crack full of waterzc​ — the foot of the cracktension zone:the soil pressure cut to 0soil pressureσv​ − 2cu​the face of the wallpressure on the wall →
The active pressure of an undrained clay. The raw line σv − 2cu is negative in the tension zone; the soil pressure is cut to zero there, and the crack that opens holds water, γw(z − zt) down to its foot zc. Below zc the clay pushes with σv − 2cu.

The crack is taken water-filled by default, the safe assumption; it may be declared dry above the water table, with a caution, and the result of the other case is always printed. The part of a crack below the water table holds the ground water in either case — which is why the undrained pressure equation never lets the wall take less than u.

6Short term and long termboth scenarios run; the larger of each result designs the wall

A clay is undrained just after the excavation and drained years later, and which of the two is worse for the wall is not known in advance: the short term usually gives the smaller active pressure but also the weaker passive resistance of a soft clay. The module therefore runs both scenarios and designs the wall for the larger of each result.

The two scenarios
Short termLong term
Sand layersdrained, c′, φ′drained, c′, φ′
Clay layersundrained, cu (total stress)drained, c′, φ′ (effective stress)
Pressure equationsthe drained pressure equation and the undrained pressure equationthe drained pressure equation
Tension crackin a clay above the dredge linewhere c′ makes the active pressure negative

The embedment, the force of each row of anchors and the bending moment are each taken as the larger of the two scenarios — they need not all come from the same one. A scenario in which the anchors take no tension (a strong clay standing by itself in the short term) does not design the wall; it is noted, and the other scenario designs it.

7Surcharges on the retained surfaceuniform, strip and point loads

The loads on the retained surface are those of the sand and clay modules — a list in which each load is uniform, strip or point (the figure below).

  • Uniform — q is added to σv,b at every depth as in the equation above, and so enters the pressure through Ka or 1.
  • Strip — a load q over a width b at a distance a from the wall: the elastic solution for a rigid wall, already a lateral pressure, never multiplied by Ka.
  • Point — a load Q at a distance x: the Boussinesq solution doubled for a rigid wall, at the section of wall through the load.
σH=2qπ(β−sinβcos2α)strip load: β the angle the strip subtends at the point of the wall, α the angle to its middle
σH=3Qx2zπR5R=x2+z2point load at the most loaded section, taken for every metre of wall — on the safe side; x ≥ 0.30 m
Strip loadqβαabzPoint loadQRx ≥ 0.30 mz
The strip and the point load. The strip-load and point-load pressures vary with depth in a curve; they are integrated adaptively inside each segment of the diagram.

In the seismic situation each load enters with its combination factor ψ2.

8The net pressure diagramthe two faces, their difference, and its exact segments

The wall feels the difference of the two faces. The net pressure is the pressure of the retained face less that of the excavation face,

pnet(z)=pb(z)−pf(z)positive toward the excavation; above the dredge line pf is the water standing in the excavation, if any

and it is this diagram that the equilibrium of the wall is written on (the figure below). Above the dredge line it is the active pressure of the retained soil and its water; below it the passive resistance of the embedment grows faster than the active pressure behind, and the net pressure passes through zero at a point E and turns against the retained side.

The two facespa,b​pp,f​dredge linesand / clayThe net pressureLE — the net pressure is zerotoward the excavationtoward the retained side← the jump at the layer boundary
A sand over a clay, drained, with a surcharge and no water — computed with the Rankine equation and the drained pressure equation. Left: the active pressure of the retained face and the passive resistance of the excavation face below the dredge line. Right: their difference, the net pressure, with its jump at the layer boundary and its zero at E.

Segments, and their exact integration

The events of the model — the top of the wall, every anchor, the dredge line, each layer boundary, each water level, the ends of every crack, the edges of the loads and every zero of a clipped pressure — cut the wall into segments. Inside a segment every linear component of the pressure is exactly linear, so its force and its moment about any depth zr are integrated exactly:

Fseg=12(p0+p1)hMseg(zr)=h[p0(2z0+z1)+p1(z0+2z1)]6−zrFsega segment from z0 to z1, h = z1 − z0, pressures p0 and p1 at its ends

The strip and point pressures, which are curved, are added by adaptive quadrature in the same segments. A jump is two pressures at one depth — one closing the segment above, one opening the segment below — so nothing is lost at a layer boundary.

9Where the margin of safety goesa factor on the depth, or a factor of safety on the passive pressure

The equilibrium diagram gives the depth at which the wall is just in balance, Dtheory. A wall built to that depth would have no margin, so one is added — by one of two routes, chosen in Design factors (the figure below):

A factor f on the depthDtheory​× fthe full passive pressure, the toe driven deeperA factor of safety on the passive pressureDtheory​pp​ / FSp​a reduced passive pressure, the depth used as found
The two routes. Left: the diagram with the full passive resistance, and its depth Dtheory multiplied by f. Right: the passive soil pressure divided by FSp, and the depth that balances this reduced diagram used as it is.
  • A factor f on the depth — Dreq = f · Dtheory, with f = 1.2 to 1.3 for a sand and 1.4 to 1.6 for a clay in the source. The forces and the moment are those of the theoretical diagram.
  • A factor of safety on the passive pressure — ηp = 1/FSp multiplies the passive soil pressure in the drained pressure equation and the undrained pressure equation (Kpσ′v + 2c′√Kp drained, σv + 2cu undrained), never the pore water; the depth that balances the reduced diagram is Dreq.

The Dreq of the other route is always printed beside it, so the two can be compared.

An embedment given by the engineer

When the depth of the wall is given, it is verified: URD = Dreq / Dgiven ≤ 1. The module also finds the factor of safety the given wall mobilises — the factor by which the passive soil pressure can be divided before the diagram is only just in equilibrium with its toe at the given depth:

D(ηp=1/FSp,mob)=Dgiven

A longer wall in equilibrium with a partly mobilised passive resistance can bend more than the design wall, so the internal forces are worked for both — the design case and this given-depth case — and the sheet pile and the anchors are designed for the larger. For an anchored wall the moment of the pressure below the lowest anchor about it is linear in ηp, so FSp,mob follows exactly; for a cantilever it is found by Brent's method.

10The cantilever — the toe blockΣ H and Σ M with the reversed pressure at the toe

A cantilever rotates about a point near its toe, and below that point the pressures reverse. The conventional method of the source replaces the curved reality with a straight construction: the net line through E down to a point F, and from F a toe block that swings to the reversed ordinate σ4 at the toe (the figure below).

dredge lineEFHσ4​σ3​L5​Dactivenet passivethe toe block
The net pressure of a cantilever. Above E the retained side pushes; between E and F the embedment resists; from F, L5 above the toe, the block swings to σ4. The dashed line F–H only fixes the ordinate σ3 at the toe; it is not a pressure area.

With H1 and M1 the resultant of the net diagram down to a trial toe and its moment about the toe, σ3 the net pressure there (the excavation face passive) and σ4 the reversed ordinate (the retained face passive less the excavation face active), the two conditions of equilibrium are

H1+12(σ3+σ4)L5=0Σ H = 0: the height of the block for a trial depth
M1+(σ3+σ4)L526=0Σ M about the toe = 0: the embedment

For a single sand these reduce to the source's fourth-degree equation in L4; in a layered profile they are solved numerically on the same diagram. The depth is sought beyond the one at which the passive area has caught up with the active one, and the block is added to the net diagram as the triangle (σ3 + σ4)(z − zF)/L5 — the source's line F–H wherever the net pressure is linear there. The method needs the block below the zero point, 0 < L5 < L4; otherwise a caution is raised.

11One row of anchors — free earth supportthe moment about the anchor gives the depth, the horizontal balance the force

With one row of anchors near the top the wall no longer needs to rotate about its toe: it is held at the anchor, and the embedment only has to supply the passive reaction that closes the equilibrium. The toe is assumed free to translate — free earth support (the figure below).

dredge lineFanchorza​DactivepassiveΣ M about the anchor = 0 gives D; Σ H = 0 gives F.
Free earth support. The moment of the net pressure about the anchor fixes the embedment D; horizontal equilibrium then gives the anchor force F per metre of wall.
∫0L+Dpnet(z)(z−za)dz=0Σ M about the anchor at za = 0: the embedment D
F=∫0L+Dpnet(z)dzΣ H = 0: the anchor force per metre

Both integrals are sums of the exact segment integrals. Free earth support gives the shortest wall and the largest moment of the classical methods; the moment reduction of Rowe for a flexible wall is not applied.

12Several rows of anchors — the hinge methodhinges at the lower anchors, simple spans, free earth support at the bottom

Two or more rows of anchors make the wall a continuous beam on several supports, statically indeterminate. The hinge method — the one the sand and clay modules use — makes it determinate by assuming a hinge (zero moment) at every anchor below the uppermost (the figure below).

dredge lineF1​F2​F3​top of the wall to anchor 2carried by F1​ and F2​anchor 2 to anchor 3a simple beambelow the lowest anchorfree earth support about ithinge
The hinge method. The wall from the top to the second anchor is carried by the first two anchors; every span between two anchors is a simple beam; the part below the lowest anchor is designed by free earth support about it.
  1. The span from the top of the wall to the second anchor is a beam on the first two anchors: the upper reaction is the moment of its pressure about the second anchor divided by the span; the rest goes to the second anchor.
  2. Each span between two anchors is a simple beam in the same way, its reactions shared by its two ends.
  3. Below the lowest anchor the embedment follows from free earth support about it:
∫znL+Dpnet(z)(z−zn)dz=0zn the depth of the lowest anchor

The force of a row is the sum of the reactions of the spans on either side of it; the lowest row also takes the horizontal force of the part below it. The moment is then zero at every hinge — which the module checks as a closure condition. A row that the idealisation leaves in compression is named in a caution.

13Shear force and bending momentV and M on the segments, Mmax where V = 0, the root scan

With the depth and the anchor forces known, the shear force and the bending moment follow by integrating the net pressure down the wall, the anchor forces entering as point loads:

V(z)=∫0zpnetdz−Σza,i<zFiM(z)=∫0zVdz

Both are integrated on the same segments as the pressure, so they are exact wherever the pressure is linear. The maximum moment is found where V = 0 inside a segment, not picked from the nodes, and its depth zM is reported with it.

Finding the embedment

The embedment equation — the moment about the toe, the moment about the anchor or the moment about the lowest anchor — is scanned over the whole admissible range of D: from 0.001 m, then 0.05, 0.10 and 0.20 m, every 0.10 m up to the limit, and at every event depth. Each change of sign is closed by Brent's method, and the smallest admissible root is taken. No root is an answer too: the calculation stops, with the diagram drawn.

Closure checks. The shear and the moment must close at the toe; the moment must vanish at every hinge; the resultant of the segments must agree with a fine quadrature of the diagram. These are stops, not warnings: a result that does not close is not shown as a result.

14The anchorsthe force per anchor, the free length, the bond and the lock-off load

The reaction F of a row is a force per metre of wall. The anchors of the row are spaced s apart and inclined at α below the horizontal, so each carries

T=FscosαTv=TsinαTv belongs to the vertical equilibrium of the wall and is never counted as lateral resistance
dredge linecritical surfaceθ = 45° + φ′/2sc​Lf​Lb​ — the bond zoneDb​ — grout bodyαza​
An anchor: the tendon runs from its head through the active wedge, bounded by the critical surface from the excavation corner; its free length ends behind that surface with a margin, and the bond zone — the grout body of diameter Db and length Lb — transfers the force to the ground beyond.

The free length

The bond zone must lie behind the soil that moves with the wall. The critical surface starts at the excavation corner and rises at θ = 45° + φ′/2; along the tendon it is met at

sc=L−zacosαtanθ+sinαLf≥sc+max(1.5m,L5)also Lf ≥ 4.5 m for a strand tendon and 3.0 m for a bar

The surface is made automatically when one sand forms the whole retained height. For a layered or clay retained profile a single plane is not a sound construction, so the engineer enters the surface established by a separate analysis — or the check is reported as not made.

The bond and the lock-off load

Tult=πDbLbτultFSbond=Tultmax(T,P0)≥FSreqa preliminary ground-bond capacity; FSreq = 2.0 by default

τult is the engineer's, with its source. An anchor is locked off at its prestress P0, and the bond carries that load from the start, so the demand on the bond is the larger of T and P0. The ratio P0/Tult ≤ 1 is checked separately, as a sanity check of the inputs. The tendon is checked against its capacity; the proof and performance tests, and the deep-seated stability of the block between the wall and the anchors, are outside the module and named as not checked.

15The seismic situationMononobe–Okabe in the drained layers, the undrained wedge in the clay

In the seismic situation every static coefficient is replaced by the pseudo-static one of its layer. The seismic angle follows from the horizontal and vertical coefficients:

tanθ=kh1∓kvbelow the water with restrained pore water tan θw = γsat/(γsat − γw) · kh/(1 ∓ kv)

A sand, and a clay in the long term — Mononobe–Okabe

KAE=cos2(φ′−θ)cos2θ[1+sinφ′sin(φ′−θ)cosθ]2KPE=cos2(φ′−θ)cos2θ[1−sinφ′sin(φ′−θ)cosθ]2vertical wall, level ground, no wall friction
σAE=(1∓kv)KAEσ′vσPE=(1∓kv)KPEσ′vc′ is not credited in the seismic situation

A clay in the short term — the undrained wedge

σAE=(1∓kv)(1+tanθ)σv−2cuσPE=(1∓kv)(1−tanθ)σv+2cuthe pseudo-static undrained wedge with its plane at 45° — Mononobe–Okabe degenerates at φ = 0; a GeoTerva assumption, stated in the report

Both scenarios of the static design are run, each with both senses of kv, and the largest embedment, moment and anchor forces govern. An anchored wall cannot rotate about its toe, so the dynamic increment of the active thrust over the retained height is spread uniformly over it:

ΔPAE=∫0L(pAE−pA)dz

Free water standing in the excavation adds its Westergaard pressure, 7/8 kh γw √(h z). The passive resistance carries no factor in this accidental situation: the embedment DE that balances the seismic diagram must not exceed that of the wall. When the wall is longer than DE, every case is also solved in equilibrium at the given depth, and the larger moment and anchor forces of the two are used.

The coefficients are applied layer by layer; a single seismic wedge through the layers is not used, and the report says so. θ ≥ φ′ in a sand is the limit of Mononobe–Okabe: the check is then reported as not analysed, with the reason.

16Verifying the sheet pileEN 1993-1-1 or AISC 360-22 on the maximum moment

The steel section is verified in bending with the maximum moment of the design. Two codes are offered.

EN 1993-1-1

MEd=γFMmax≤Mc,Rd=WfyγM0Wreq=MEdγM0fy

AISC 360-22

LRFD:γHMmax≤φbMnASD:Mmax≤MnΩbφb = 0.90, Ωb = 1.67; Mn by the specification — the plastic moment of a compact section, less for a noncompact or slender one, first yield where the walls of the section are not known

W is the modulus of the whole wall per metre, from the manufacturer's table — elastic or plastic as the class of the section allows. The required modulus Wreq is always printed, so that a section can be chosen from a catalogue. The shear of the wall, the local buckling of its elements and the loss to corrosion are outside the check and named in the report.

17Bottom heave of a clay basethe heave block at the foot of the wall

When the base of the excavation is a soft clay, the weight of the retained ground can squeeze the clay up into the excavation. The module checks this bottom heave as the clay module does, with a bearing-capacity block at the foot of the wall — B′ = B/√2 for an excavation of width B, or the depth T to a hard layer where that is smaller, and B″ = √2 B′:

FSheave=5.14cu(1+0.2B′′Lexc)+csideHB′σv(H)+qcu below the base, cside the mean undrained strength along the retained height H, Lexc the length of the excavation (the shape term drops for a long one)

Strip and point loads within the width B′ are turned into an equivalent surcharge on the block. When the soil at the base is not a clay the check is not applicable, and the report says so.

18The displacement of the wallan elastic beam on elasto-plastic springs, the anchors as tension-only springs

Limit equilibrium gives forces, not movements. For an estimate of how far the wall moves, the module uses the subgrade reaction method of the sand and clay modules: the wall is an elastic beam (E I per metre) on elasto-plastic springs on both faces.

  • Each spring starts from the at-rest pressure — K0σ′v with K0 = 1 − sin φ′ in a drained layer, σ′v in an undrained clay — and moves with the wall at the rate kh of its layer until it reaches the active or the passive limit of the layer's framework.
  • Each anchor is a prestressed spring, k = E At cos²α / (Lf s), starting from P0 cos α / s. It acts in tension only: an anchor that would be pushed goes slack, and the solution is repeated until no spring or anchor changes its state.
  • The net water pressure and the surcharges load the beam directly.

The result is characteristic and indicative: it depends on kh — strongly while the springs are soft, hardly at all once the soil has reached its limits — and kh is a model parameter rather than a soil constant. It is reported without a limit.

19The opening model, by the moduleevery number computed by the module's own code

The model the Model tab opens with is a wall retaining L = 7.5 m of sand (3.0 m) over clay (6.0 m) over sand, with the water table 8.5 m below the top on both faces, a uniform surcharge q = 10 kPa and two rows of anchors — at 1.5 m and 4.5 m, spaced 2.5 m, inclined 15° and 20°. The margin is the factor f = 1.3 on the depth. Every number below is computed by the module's own code as this page opens; the same model is a bench record of the module, checked by an independent hand calculation.

The layers of the opening model
LayerSoilThickness (m)γ / γsat (kN/m³)φ′ (°)c′ (kPa)cu (kPa)KaKp
1sand3.018.0 / 20.0300—0.33333.0000
2clay6.019.0 / 19.5245450.42172.3712
3sandto the toe19.0 / 21.0360—0.25963.8518
Ka and Kp by the Rankine equation from φ′ — the drained (long-term) values.

The long term, by hand, above the dredge line

Above the water table and the dredge line only σ′v and the drained pressure equation are needed:

σ′v(3.0)=10+18×3.0=64.0kPapa=0.3333×64.0=21.33kPathe foot of the sand
pa=0.4217×64.0−2×5×0.4217=20.50kPathe top of the clay — the jump at the boundary
σ′v(L)=64.0+19×4.5=149.5kPapa=56.55kPathe dredge line

In the short term the same clay is undrained: at its top σv − 2cu = 64.0 − 90 = −26.0 kPa < 0, so the soil pressure is cut to zero and a water-filled crack opens down to zc = 4.37 m, where σv = 2cu, as in the tension-crack equation.

The two scenarios

The results of the two scenarios, by the module
Short termLong termDesign (the larger)
Dtheory (m)1.5492.4032.403
Dreq = f · Dtheory (m)2.0143.1243.124
F1 (kN/m)34.3041.6941.69
F2 (kN/m)56.94132.32132.32
Mmax (kN·m/m)59.49121.43121.43
zM (m)6.5466.8256.825
The long term governs every result here: the drained clay pushes harder than the undrained one, whose top stands in a crack. The other route of the margin — the passive pressure divided by FSp = 1.50 — would give Dreq = 3.273 m.

The anchors

T1=41.69×2.5cos15°=107.9kNFSbond,1=754.0max(107.9,250)=3.016Tult = π × 0.20 × 8.0 × 150 = 754.0 kN; the bond demand is the lock-off load P0
T2=132.32×2.5cos20°=352.0kNFSbond,2=754.0max(352.0,250)=2.142Tult = π × 0.20 × 8.0 × 150 = 754.0 kN; the bond demand is the anchor force T

The sheet pile, the heave and the displacement

MEd=1.35×121.43=163.92kN·m/mWreq=596cm3/mEN 1993-1-1, steel S275, γF = 1.35
Mc,Rd=1400×10−6×2750001.00=385.0kN·m/mthe sheet pile of the opening model, W = 1400 cm³/m
η=MEdMc,Rd=163.92385.0=0.426≤1
FSheave=259.9139.5+10=1.739B′ = 7.071 m; the clay along the retained height gives cside = 27.0 kPa

By subgrade reaction the top of the wall moves 2.6 mm back toward the retained side — pulled by the prestressed anchors, and the wall at the dredge line 11.2 mm toward the excavation: characteristic and indicative.

Components of the lateral pressure — retained face to the right of the axis, excavation face to the left; the net pressure in black02468z (m)dredge lineanchor 1anchor 21005050100p (kPa)active soilpore water (each face)passive soil (with ηp​)net pressure
The opening model as the module draws it: the pressure components of the two faces over the design diagram, and the net pressure.
Shear force and bending moment along the wall — V jumps by F at every anchor; M > 0 puts the retained face in tension02468V (kN/m)−9797F1​ = 41.7 kN/mF2​ = 132.3 kN/mM (kN·m/m)−121121Mmax​ = 121.4 kN·m/mz (m)
The shear force and the bending moment of the opening model, with the anchor forces — as in the Calculations tab.

20What the module assumes, and what it does not dothe assumptions, the messages and the limits in one place

Every calculation rests on assumptions. The module sorts them by how they reach the report:

  • Declared — no wall friction (δ = 0); the margin of the free length measured along the tendon; the point load taken at its most loaded section; the seismic coefficients layer by layer.
  • Declared and shown both ways — the short- and the long-term scenarios (both run); the crack water-filled or dry (the other printed); the margin on the depth or on the passive pressure (the other printed).
  • Stops — an anchor outside the wall; a layer without the strength its scenario needs; no admissible embedment; anchors in compression in every scenario; a failed closure; a bond zone inside the critical wedge.
How each message is raised
ConditionLevelWhat happens
Anchor outside 0 < za < L; two rows closer than 0.25 mstopnothing is calculated
A layer without cu (short term) or φ′ (drained)stopthe layer and the scenario are named
No admissible embedment; the anchors in compression in every scenario; closure failedstopthe pressure diagram is drawn
Free length shorter than sc + max(1.5 m, L/5)stopthe bond zone would lie inside the wedge
Unequal water levelsvalidity bannerPRELIMINARY, no PASS verdict; the piping check named
Dry crack; no critical surface; short embedment; weak bond; tendon over capacity; toe block above E; row in compression; seismic domain; deep-seated stabilitycautionreported with what was assumed
Cut-off active; several roots; the scenarios; point load moved to 0.30 mnote / infothe fact and the assumption

The screen may suggest what to do next; the report only states what was assumed and found.

What the module does not do yet

  • Rowe's moment reduction for a flexible wall — read from families of charts; to come with its own validation.
  • Deep-seated stability and the overall stability of the wall and the ground — named as not checked in every anchored run.
  • Seepage — unequal water levels are hydrostatic and carry the validity banner.
  • A sloping retained surface, line loads and construction stages — later releases.

21Referencesthe source, the anchors, the codes

  • Das, B.M. (2016). Principles of Foundation Engineering, 8th ed. Cengage Learning.
  • Rankine, W.J.M. (1857). On the stability of loose earth. Philosophical Transactions of the Royal Society of London, 147, 9–27.
  • Mononobe, N. and Matsuo, H. (1929). On the determination of earth pressure during earthquakes. World Engineering Congress, Tokyo. Okabe, S. (1926). General theory of earth pressure. Journal of the Japan Society of Civil Engineering, 12(1).
  • Westergaard, H.M. (1933). Water pressures on dams during earthquakes. Transactions of the American Society of Civil Engineers, 98, 418–433.
  • Bowles, J.E. (1996). Foundation Analysis and Design, 5th ed. McGraw-Hill.
  • Brent, R.P. (1973). Algorithms for Minimization without Derivatives. Prentice-Hall.
  • EN 1993-1-1:2005 — Design of steel structures, general rules.
  • ANSI/AISC 360-22 — Specification for Structural Steel Buildings.

From theory to your own design

Design your own anchored wall in minutes

  • Sand and clay layers, water on both faces, surcharges and the earthquake, with short-term and long-term scenarios
  • Up to four rows of inclined anchors: forces, free length, bond and lock-off load
  • Embedment, shear and moment, the sheet pile checked to EN 1993-1-1 or AISC 360-22, bottom heave and displacement
  • A clean calculation report, saved as a PDF. Works on your phone and in your browser