Elastic settlement of a single pile: Vesic’s three parts

How far a pile settles at its working load: the shortening of the pile itself, the settlement its point load causes and the settlement its shaft load causes, with the influence factors and the distribution factor ξ.

  • Free to read
  • se1 + se2 + se3
  • Iws table
  • Worked example

1The three partsThe pile shortens, its point and its shaft load the soil.

Under its working load Qw a pile settles for three reasons: the pile itself shortens, the load at its point compresses the soil below the tip, and the load passed to the soil along the shaft compresses the soil around and below it. Vesic (1977) wrote the elastic settlement as the sum of the three:

se=se1+se2+se3,Qw=Qwp+Qws

Qwp is the part of the working load carried by the point and Qws the part carried by the shaft. How the load divides at working load depends on the stiffness of the shaft and the base and is best known from an instrumented load test; the GeoTerva pile group module divides it in the proportion of the ultimate resistances, Qws/Qw = Qs/Qu. The method takes the soil as one elastic material with the modulus Es and Poisson’s ratio μs; it gives the settlement that occurs as the load is applied, not the long-term consolidation of a clay.

2The shortening of the pile, se1Elastic shortening, with ξ for the shaft load.

se1=(Qwp+ξQws)LApEp

Ap is the area of the pile section and Ep the modulus of its material. The point load runs through the whole length; the shaft load leaves the pile gradually, so on average only a part ξ of it is in the pile. If Ns(z) is the part of the shaft load still in the pile at depth z,

ξ=1L∫0LNs(z)Qwsdz

which gives ξ = 1/2 for a skin friction uniform along the shaft, 2/3 for one that increases linearly from zero at the top, and 1/3 for one that decreases linearly to zero at the tip. The module accepts 0.5 to 0.67 and fills in 0.6. For the pile of the worked example se1 is 0.81 mm with ξ = 0.5 and 0.90 mm with ξ = 0.67: the choice matters little, because the shortening is a small part of the settlement of a concrete pile.

3The settlement from the point and the shaft loadIwp and Iws.

The point load acts as a load on the surface of an elastic half-space at the tip, of intensity qwp = Qwp/Ap:

se2=qwpDEs(1−μs2)Iwp

The shaft load, spread as a mean unit friction Qws/(pL) over the shaft, compresses the soil around the pile:

se3=QwspLDEs(1−μs2)Iws,Iws=2+0.35LD

D is the width of the pile, p its perimeter and L its embedded length; Es and μs belong to the soil at and below the base. Iwp and Iws are influence factors; the module takes Iwp = 0.85 and Iws from the length of the pile:

Table 1. Influence factor Iws = 2 + 0.35√(L/D) of the shaft load
L/D√(L/D)Iws
52.2362.783
103.1623.107
153.8733.356
204.4723.565
255.0003.750
305.4773.917
406.3254.214
507.0714.475
607.7464.711
808.9445.130
10010.0005.500

Values computed by GeoTerva with the function its pile group module uses.

4Vesic’s semi-empirical formWith the coefficient Cp.

Vesic (1977) also gave the point and shaft settlements in terms of the ultimate point resistance qp and an empirical coefficient Cp, instead of Es:

se2=QwpCpDqp,se3=QwsCsLqp,Cs=(0.93+0.16LD)Cp

His values of Cp are 0.02–0.04 for a driven pile and 0.09–0.18 for a bored pile in sand, 0.02–0.03 and 0.03–0.06 in clay, and 0.03–0.05 and 0.09–0.12 in silt, the lower value for a dense or stiff soil. The GeoTerva module uses the elastic form of the previous section, with Es and μs entered.

5Worked exampleA driven precast pile in sand.

A precast concrete pile, square 0.45 m × 0.45 m, is driven 16 m into a medium dense sand with φ′ = 33°, γ = 18 kN/m³ above the water table at 2 m and 20 kN/m³ below it. Ep = 30000 MPa; below the base Es = 35 MPa and μs = 0.3; ξ = 0.6.

  • Capacity (K–δ method for the shaft, Meyerhof for the point): Qs = 584.7 kN, Qp = 631.2 kN, Qu = 1215.9 kN. The working load is Qw = Qu/3 = 405.3 kN, divided as 48.1 % to the shaft: Qws = 194.9 kN, Qwp = 210.4 kN.
  • Shortening: Ap = 0.2025 m², se1 = (210.4 + 0.6 × 194.9) × 16 / (0.2025 × 3.0 × 107 kPa) = 0.86 mm.
  • Point: qwp = 210.4/0.2025 = 1039.1 kPa, se2 = 1039.1 × 0.45 / 35000 × (1 − 0.3²) × 0.85 = 10.33 mm.
  • Shaft: p = 1.80 m, L/D = 35.56, Iws = 2 + 0.35√35.56 = 4.087, se3 = 194.9/(1.80 × 16) × 0.45/35000 × (1 − 0.3²) × 4.087 = 0.32 mm.
  • Total: se = 0.86 + 10.33 + 0.32 = 11.52 mm.

The largest part is the settlement caused by the point load, se2, 90 % of the total. Table 2 shows how the settlement follows the soil modulus, and Table 3 how it follows the share of the working load the shaft carries; the row of the worked example is in bold.

Table 2. Elastic settlement of the worked pile against the modulus of the soil
Es (MPa)se1 (mm)se2 (mm)se3 (mm)se (mm)
100.8636.171.1338.16
200.8618.080.5719.51
350.8610.330.3211.52
500.867.230.238.32
750.864.820.155.84
1000.863.620.114.59

se1 does not depend on Es; se2 and se3 are inversely proportional to it. Values computed by GeoTerva.

Table 3. Elastic settlement of the worked pile against the share of Qw = 405.3 kN carried by the shaft
Shaft share (%)Qws (kN)Qwp (kN)se1 (mm)se2 (mm)se3 (mm)se (mm)
30121.6283.70.9413.930.2015.07
40162.1243.20.9011.940.2713.11
48 (module)194.9210.40.8610.330.3211.52
60243.2162.10.817.960.409.18
70283.7121.60.775.970.477.21
80324.281.10.733.980.545.25
90364.840.50.681.990.613.28

The module’s share is Qs/Qu. Values computed by GeoTerva with the function its pile group module uses.

At working load a pile in sand usually passes more of its load to the shaft than the ratio of the ultimate resistances suggests, because the shaft resistance is mobilised at a few millimetres of movement and the point resistance at a movement of several per cent of the width. With 90 % of the load on the shaft the same pile would settle 3.28 mm instead of 11.52 mm; the proportion of the ultimate resistances that the module uses is on the safe side. In a group the settlement of one pile is multiplied by √(Bg/D) (see pile group settlement).

6QuestionsShort answers.

Which part of the elastic settlement of a pile is the largest?

With the working load shared in the proportion of the ultimate resistances, as the GeoTerva module shares it, it is usually the settlement caused by the point load, se2, for a pile bearing in sand: 90 % of the total in the worked example, where the shortening of the pile, se1, is 7 %. The more of the load the shaft carries, the smaller se2 becomes (Table 3).

What is ξ in the shortening of a pile?

The mean fraction of the shaft load that is still in the pile over its length: 0.5 for a uniform skin friction, 0.67 for one that grows linearly with depth from zero at the top. The GeoTerva module accepts 0.5 to 0.67 and fills in 0.6.

Which soil modulus should be used for the settlement of a pile?

The modulus of the soil at and below the base, which governs se2 and se3: from in-situ tests (pressuremeter, plate or cross-hole seismic tests) or correlations with SPT or CPT results. Both parts are inversely proportional to it (Table 2), so it is the input to which the settlement is most sensitive.

The theory behind it