适用于每个钻孔的每次 SPT 试验的 Idriss & Boulanger (2014) 计算规程,结合场地的地震震级与地震动峰值加速度。
输入参数
- 包含击数 N、细粒含量和重度的钻孔数据
- 地下水位
- 震级与 PGA
您将得到
- (N₁)₆₀cs, CSR, CRR, FS
- 液化区与临界区
- 钻孔间剖面
- 项目概况

计算后的计算图形与判定结论。
适用于每个钻孔的每次 SPT 试验的 Idriss & Boulanger (2014) 计算规程,结合场地的地震震级与地震动峰值加速度。
输入参数
您将得到

计算后的计算图形与判定结论。
Factor of safety against liquefaction from SPT blow counts. The Idriss & Boulanger (2014) procedure for every SPT test of every borehole, with the earthquake magnitude and the peak ground acceleration of the site.
Boreholes with N, fines and unit weights; water table; and magnitude and PGA.
(N₁)₆₀cs, CSR, CRR, FS; triggered and marginal zones; sections between boreholes; and project summary. Every step of the working is written out, and the results go into a Word or PDF report.
Idriss & Boulanger (2014).
Yes: a free account opens every module for 7 days, on screen, with no card. The module is part of the Liquefaction pack (2 modules): $249 a year or $25 a month, per user, in US dollars without sales tax. It is also in the Ground & stability bundle ($499 a year). GeoTerva Complete opens all 53 modules for $1,599 a year. Saving, reports and model files start with the paid period.
Yes. It runs online in any current browser, on a phone, a tablet or a PC: no installation and no dongle. SI, SI-tf and US units are available.