GeoTerva 免费试用7天

群桩分析模块

成层地基中群桩单桩荷载、群桩效应、沉降及水平响应。

注册免费账号,每个模块均可免费体验 7 天。其中 11 个模块无需账号即可直接打开工程算例:立即体验。

处于最多8层砂土和黏土中的刚性承台下竖向群桩。承台荷载在各桩间分配;承载力按单桩计算(每层土按各自土层的群桩效率折减)及整体块体破坏计算,并取二者中的较小值控制;沉降包含群桩的弹性沉降以及2L/3下方黏土层的固结沉降;在水平荷载作用下,各排桩通过各土层 p–y 曲线的 p折减系数实现非均匀分担。

输入参数

  • 排数与桩数、桩距、截面及桩长
  • 多达 8 层土层,砂土或黏土
  • 地下水位
  • 承台上的竖向荷载、水平荷载与弯矩

您将得到

  • 每根桩受到的受压及受拉荷载
  • 群桩效率、块体承载力与容许荷载
  • 弹性沉降与固结沉降
  • 承台位移与每排桩的荷载分配
桩基工程 · 群桩分析
群桩分析模块:工程算例、模型、结果、计算与理论界面展示

计算后的计算图形与判定结论。

深入了解

桩基工程分组中的更多模块

为什么简单易用

在线使用,无需安装除浏览器外无需运行任何软件:打开网页即可开始工作。
无需加密锁,免安装无许可证密钥,无硬件锁,无需进行繁琐的软件更新。
支持手机、平板和电脑在任何现代浏览器中运行相同模块,界面自动适配设备屏幕。

Questions about the Pile group module

What does the GeoTerva Pile group module calculate?

The load on every pile, the group effect, the settlement and the lateral response of a group in layered ground. A group of vertical piles under a rigid cap, in up to eight layers of sand and clay. The cap load is shared among the piles; the capacity is worked out as individual piles, each layer with the efficiency of its own soil, and as a block, and the lesser governs; the settlement is the elastic settlement of the group and the consolidation of the clay below 2L/3; and under a lateral load the rows share it unequally, by p-multipliers on the p–y curves of the layers.

What do I enter in the Pile group module?

Rows and piles, spacing, section and length; up to eight layers, sand or clay; water table; and vertical load, lateral load and moments on the cap.

What results does the Pile group module give?

The load on every pile, in compression and tension; efficiency, block capacity and the allowable load; elastic and consolidation settlement; and the deflection of the cap and the load of every row. Every step of the working is written out, and the results go into a Word or PDF report.

Which methods does the Pile group module use?

Converse–Labarre; kishida–Meyerhof, AASHTO; block failure; and p-multipliers.

How much does the Pile group module cost, and can I try it free?

Yes: a free account opens every module for 7 days, on screen, with no card. The module is part of the Piles pack (5 modules): $349 a year or $35 a month, per user, in US dollars without sales tax. It is also in the Foundations bundle ($579 a year). GeoTerva Complete opens all 53 modules for $1,599 a year. Saving, reports and model files start with the paid period.

Does the Pile group module run on a phone or a tablet?

Yes. It runs online in any current browser, on a phone, a tablet or a PC: no installation and no dongle. SI, SI-tf and US units are available.