根据 Peck 方法,将开挖深度内黏土上覆的砂土简化为等效黏土层,并由稳定数确定表观土压力包络图。支撑轴力、截面验算及坑底抗隆起验算流程与黏土模块一致。
输入参数
- 砂土与黏土成层地质
- 基坑几何尺寸
- 内支撑
- 钢材牌号与设计规范
您将得到
- 等效黏土层参数
- 压力包络图与支撑轴力
- 截面
- 坑底隆起

计算后的计算图形与判定结论。
根据 Peck 方法,将开挖深度内黏土上覆的砂土简化为等效黏土层,并由稳定数确定表观土压力包络图。支撑轴力、截面验算及坑底抗隆起验算流程与黏土模块一致。
输入参数
您将得到

计算后的计算图形与判定结论。
A sand layer over clay, reduced to one equivalent clay. Sand above clay inside the cut is reduced to one equivalent clay by Peck’s method, and the envelope follows from the stability number. Strut loads, sections and bottom heave are checked as in the clay module.
Sand and clay layers; cut geometry; struts; and steel grades and code.
The equivalent clay; envelope and strut loads; sections; and bottom heave. Every step of the working is written out, and the results go into a Word or PDF report.
Peck (1943, 1969).
Yes: a free account opens every module for 7 days, on screen, with no card. The module is part of the Braced Cuts pack (3 modules): $249 a year or $25 a month, per user, in US dollars without sales tax. It is also in the Retaining & excavation bundle ($799 a year). GeoTerva Complete opens all 53 modules for $1,599 a year. Saving, reports and model files start with the paid period.
Yes. It runs online in any current browser, on a phone, a tablet or a PC: no installation and no dongle. SI, SI-tf and US units are available.