Braced Cut in Sand Module

GeoTerva

Free demo, no sign-up

Braced cut in sand, on a worked example you can change

Peck’s envelope for sand with the water table below or above the base, the strut loads from the hinged spans, and the section moduli of the sheeting and the wales. When the cut is dewatered the factor of safety against piping is checked.

You enter

  • Cut depth and width
  • Sand γ and φ′, water table
  • Strut levels and spacing
  • Steel grades and code

You get

  • The pressure envelope
  • The load of every strut
  • Sheeting and wale sections
  • Factor of safety against piping

The module opens here in a moment. It runs in your browser: there is nothing to install and no dongle.

About this module · Theory · User manual · Plans and prices