On this page · 21 chapters
- 1Scope
- 2Cohesive and granular layers
- 3Immediate settlement — theory of elasticity
- 4Steinbrenner's influence factors
- 5Layered profile and net pressure
- 6Stress path of the cohesive layers
- 7Slices and initial stresses
- 8Preconsolidation pressure
- 9Excavation — unloading and swelling
- 10Stress increase — Boussinesq
- 11Depth of the settlement calculation
- 12Compression regimes
- 13Where the settlement is measured from
- 14mv method
- 15Flexible and rigid foundations
- 16Total settlement
- 17Time-dependent consolidation
- 18Colour-band fields
- 19Sign convention and assumptions
- 20Outside the scope
- 21References
The module computes the total settlement of a foundation on a layered profile of cohesive and granular soils, as the sum of two parts: the immediate (elastic) settlement Se of every layer, and the consolidation settlement Sc of the cohesive layers.
1Scope
The two parts are computed on the same slices of the profile, with the same stress increase of Boussinesq, the same excavation and the same calculation depth. It is an analytical calculation — closed-form influence factors, a slice-by-slice stress path and Terzaghi's theory — with no finite elements; the section is drawn in colour bands (stress, strain and settlement at every point of a plane section through the foundation) and the settlement–time curve follows from the consolidation of the cohesive layers. On a profile of cohesive layers only, Sc and the time curve are those of the Consolidation module; on a profile of one kind of layer, Se is that of the Elastic Settlement modules.
2Cohesive and granular layers
| Layer | Immediate settlement | Consolidation |
|---|---|---|
| Cohesive (clay, silt) | undrained: Eu, ν = 0.5 — no volume change right after loading | yes: Cc, Cr, Cs, e0, σ′p (or mv), Cv |
| Granular (sand, gravel) | drained: E′, ν′ | none — the water leaves as fast as the load is applied |
A saturated clay deforms at constant volume as the load is applied (ν = 0.5): that is its immediate settlement. The water then leaves slowly and the clay compresses along its stress path: that is its consolidation. A sand drains at once, so its whole settlement is the elastic one. Each layer is cohesive or granular; the type is chosen in the Soil profile table and decides which parameters the layer needs below the foundation level.
3Immediate settlement — theory of elasticity
Under a perfectly flexible foundation carrying the net pressure qnet, Hooke's law gives the vertical strain and its integral the settlement (the source):
The stress increases are those of a homogeneous elastic half-space (Boussinesq). Because the lateral stresses depend on ν, the strain — and the settlement — depend on both E and ν.
4Steinbrenner's influence factors
For the corner of a uniformly loaded rectangle the integral has a closed form (Steinbrenner; the source):
A1 = ln[(m′ + √(m′² + 1))·√(1 + n′²) / (m′ + √(m′² + n′² + 1))] A2 = m′ / (n′ √(m′² + n′² + 1))
with m′ = L′/B′ and n′ = z/B′ (B′ the shorter side of the corner rectangle). The centre of a B × L foundation is the corner of four rectangles B/2 × L/2: α = 4, B′ = B/2; its corner is the corner of the whole rectangle: α = 1, B′ = B. Any other point is the signed sum of the four rectangles that have a corner at it. For a strip (m′ → ∞): F1 = ln(1 + n′²)/2π, F2 = (n′/2π)·tan−1(1/n′); at the edge α = 2, B′ = B. The engine evaluates the formulas directly.
5Layered profile and net pressure
A layer between the depths ztop and zbottom below the foundation level contributes the difference of the half-space solution between the two depths, with its own E and ν:
This is the integral of Hooke's strain over the layer with the stresses of a homogeneous half-space — exact for that assumption, so the result does not depend on the slice thickness Δz (the slices only serve the tables and the fields). It replaces the weighted average modulus of a single-layer formula. When the stiffness of a layer grows with depth, split it into several layers.
The excavation removes the effective overburden at its base (the water table is unchanged). With one modulus for unloading and reloading, the elastic rebound of the excavation is recovered on reloading, so the net pressure governs the immediate settlement. A net pressure at or below zero produces no settlement (a negative value is an elastic rebound).
6Stress path of the cohesive layers
The calculation is never a single step from the initial to the final stress. The excavation reduces the effective stress and the clay swells along its unloading line (Cs). When the structure reloads it, the clay first retraces that line back to σ′v0 — the heave is recovered — then recompresses with Cr up to σ′p and, when the final stress exceeds σ′p, compresses along the virgin line (Cc). σ′p is the historical maximum and is not reduced by the excavation.
The unloading–reloading loop therefore closes at the initial stress: a load that only restores the removed overburden brings every slice back to where it started, and without a net increase of the effective stress there is no settlement relative to the original ground, whatever Cs and Cr are.
7Slices and initial stresses
Every layer between the foundation level and the calculation depth zlim is divided into slices of thickness Δz (cut at the water table); every stress is evaluated at the slice midpoint.
γ above the water table, γsat below it. The stresses of the original ground are the reference for every later phase.
8Preconsolidation pressure
One definition per model. OCR = 1 is a normally consolidated clay: σ′p = σ′v0 and any loading beyond the initial stress is virgin compression. A laboratory σ′p below σ′v0 is raised to σ′v0 with a warning — under-consolidated clay is outside the scope.
9Excavation — unloading and swelling
The removed load is the initial effective overburden at the excavation base (the water table is unchanged, so below it the buoyant weight is removed). Iexc is the Boussinesq influence of the excavation plan, or 1 for a wide excavation. Heave is negative: settlement positive, heave negative throughout. When Cs is not given, Cs = Cr is used and reported.
10Stress increase — Boussinesq
Rectangle B × L under its centre: Iz = 4·Icorner(m = B/2z′, n = L/2z′) with the Newmark corner factor
(the arctangent term is increased by π when V < m²n²). Strip of width B under its centre line: Iz = (α + sin α)/π with α = 2·atan(B/2z′). At z′ = 0, Iz = 1. Off the centre line — for the colour-band fields — the rectangle is split into corner rectangles at the point and the strip uses the general solution with the two edge angles.
11Depth of the settlement calculation
The stress increase under a foundation falls with depth but never becomes zero, so the sum of the slice compressions needs a lower end — the calculation depth zlim.
With the influence depth rule the layers are compressed down to the depth where the Boussinesq stress increase under the centre of the foundation has fallen to p of the applied pressure; 10 % is the common choice. The same influence factor governs the unloading of an excavation of the same plan, so the depth is the same whether it is read on qgross or qnet. The depth grows with the size of the foundation: with p = 10 %, z′ ≈ 2.09 B for a square, 2.55 B for L = 1.5 B, 2.92 B for L = 2 B, 4.33 B for L = 5 B and 6.34 B for a strip (1.40 B, 1.71 B, 1.94 B, 2.68 B and 3.13 B with p = 20 %). A 20 × 30 m raft reaches about 51 m below its base.
When the soil profile ends above zlim, its last layer is taken to continue down to zlim with the same properties (and, for the time analysis, to end there). When it reaches below zlim, the soil below that depth is not compressed; a layer cut by zlim keeps its whole thickness for the drainage path. With the Bottom of the profile rule the calculation stops at the last layer, as over rock or dense gravel; the report gives the stress increase that is still acting there.
Another criterion used in practice compares the stress increase with the effective overburden (Δσ = 0.2 · σ′v0); it reaches deeper under a heavily loaded small footing and stops much higher under a lightly loaded wide raft. The influence-depth rule of the module depends on the geometry only, which keeps the whole compressible zone of a wide raft in the sum.
12Compression regimes
With f = ΔH/(1+e0) for the slice, and σ′exc ≤ σ′v0 ≤ σ′p:
| Condition | Slice compression on reloading |
|---|---|
| σ′exc ≤ σ′final ≤ σ′v0 | Sb = Cs·f·log10(σ′final/σ′exc) — part of the heave recovered, no compression beyond the initial state |
| σ′v0 < σ′final ≤ σ′p | Sb = Cs·f·log10(σ′v0/σ′exc) + Sr = Cr·f·log10(σ′final/σ′v0) |
| σ′v0 < σ′p < σ′final | Sb + Sr = Cr·f·log10(σ′p/σ′v0) + Sv = Cc·f·log10(σ′final/σ′p) |
| σ′p = σ′v0 < σ′final (normally consolidated) | Sb + Sv = Cc·f·log10(σ′final/σ′v0) |
| σ′final < σ′exc | further swelling with Cs (negative) |
Without an excavation σ′exc = σ′v0 and Sb = 0: the classical recompression and virgin compression from the initial stress.
13Where the settlement is measured from
An excavation followed by a foundation is a sequence of phases, and the settlement of the foundation depends on the reference its displacements are measured from — the choice Displacements after the excavation of the Excavation stage:
- Kept — from the original ground (default). The heave of the excavation phase is shown on its own; the settlement of the foundation is the net deformation at the end of the loading, S = Sc + Sheave = Σ compression beyond σ′v0. A load no larger than the removed overburden gives S = 0, and when it is smaller the ground ends above its original level (reported, the settlement 0).
- Reset to zero before loading. The displacements of the excavation phase are set to zero and the settlement is measured from the heaved excavation base: S = Sc = Sb + Sr + Sv. The recompression of the heave counts as settlement — a fully compensated foundation settles by as much as the base had heaved. This is the answer when the excavation stays open long enough for the heave to develop before the structure is built.
Both measures are always printed; the choice decides which one is reported as the settlement of the foundation, drawn on the time curve and written in the conclusion.
14mv method
A separate, linear calculation path: the same mv serves the unloading (heave = −mv·(σ′v0 − σ′exc)·ΔH) and the reloading (Sc = mv·(σ′final − σ′exc)·ΔH, of which the part up to σ′v0 is the heave recovered, Sb). Being linear, its loop closes by itself. Cc, Cr, Cs and e0 are not mixed into it.
15Flexible and rigid foundations
The formulas give the settlement of a perfectly flexible foundation: largest at the centre, smallest at the corner; their difference is the differential settlement of the flexible foundation. A rigid foundation settles uniformly, by about 0.93 times the flexible centre (the source).
16Total settlement
For every slice the immediate part and, in a cohesive layer, the consolidation part are added; the sums over the layers down to the calculation depth give the settlement of the centre of the flexible foundation:
The corner (edge) of the flexible foundation has its own immediate settlement Se (the corner of the loaded rectangle) while the consolidation is that of the centre line — the stress path is followed on the vertical through the centre, as in the Consolidation module, so the corner total is Se,corner + Sc. A rigid foundation settles uniformly: about 0.93 times the flexible centre for the immediate part (the source), with the consolidation of the centre. The excavation reduces the stresses: the immediate part follows the net pressure qnet = qgross − σ′v0(Dexc), whose elastic rebound and recovery cancel for one modulus, while the clay swells along Cs and recovers on reloading (heave).
17Time-dependent consolidation
Hdr = H for single drainage and H/2 for double drainage, with H the thickness of the layer below the foundation level (down to zlim for a last layer that continues beyond the profile). Layers with different Cv and Hdr consolidate at different rates, so the curve of the whole profile is the sum of the layer curves; its own t50 and t90 are read from that sum. Below Tv = 0.05 the early-time solution U = 2√(Tv/π) is used. The curve is that of the loading settlement Sc; the swelling is taken as complete before the loading. With the displacements kept from the original ground the curve is drawn from the heave, S(t) = Sheave + Σ Ui(t)·Sc,i, and ends at the net deformation; with the displacements reset it starts at zero.
The immediate settlement Se is there at once, so the total settlement at time t is S(t) = Se + Σ Ui(Tv,i)·Sc,i over the cohesive layers (plus the heave when the displacements are kept from the original ground, taken as complete before the loading). A profile with no cohesive layer has no time curve.
18Colour-band fields
The Contours and Settlement views paint a quantity over the section through the centre in colour bands (the legend gives the value at every third boundary): the stresses of the original ground and their changes (Boussinesq at every point), the modulus E of the layers, and the deformation fields — the immediate settlement Se(z) (Steinbrenner's factors at the point), the consolidation settlement Sc(z), the total S(z), the strain and the heave — each the compression of the soil between a point and the calculation depth, so the value at the foundation level on the centre line is the settlement of the results. The deformation fields of the cohesive layers follow the stress path of the slices at every point; the granular layers add their elastic strain only.
Classes for the deformation fields. Settlement, heave and strain are largest under the load and small at depth. With equal bands the whole lower part of the section would fall into the first band and the picture would read as if the movement stopped just under the foundation. These fields are therefore painted in classes with the limits 1 · 1.5 · 2 · 3 · 5 · 7 × 10n, from 1/300 of the maximum up, with the colours spread over the classes, and every limit is written in the legend. The stresses, the modulus and a net deformation that changes sign keep the thirty-six equal bands.
19Sign convention and assumptions
- Settlement positive, heave negative. The selector next to the units in the header switches the display to the convention in which the vertical displacement is positive upward (settlement negative, heave positive) — in the results, the tables, the drawings and the report; the engine, the derivation in the Calculations tab and the strains and stresses (compression positive) stay classical.
- Foundation level = excavation base (ground surface without an excavation); uniform pressure on a perfectly flexible foundation.
- Immediate settlement: stresses of a homogeneous elastic half-space in every layer (with that layer's ν); cohesive layers undrained (ν = 0.5), granular layers drained; no embedment correction (If = 1).
- Consolidation: one-dimensional, Terzaghi; hydrostatic pore pressure, water table unchanged by the excavation; σ′p is the historical maximum and is not reduced by the excavation.
- The stress increase is taken on the vertical through the centre of the foundation (Boussinesq) for the slices and the time analysis.
Every assumption that applies to a model is listed with its results (Warnings and assumptions).
20Outside the scope
- Secondary compression, and the consolidation of granular layers.
- Empirical sand methods (Schmertmann's strain influence factor, SPT- or CPT-based charts) and a modulus that increases with depth within a layer — split the layer instead.
- Foundation stiffness between flexible and rigid, soil–structure interaction, two- and three-dimensional consolidation, finite elements.
- Bearing capacity, liquefaction.
21References
- Das, B.M. (2016). Principles of Foundation Engineering, 8th ed. Cengage.
- Das, B.M. (2018). Principles of Geotechnical Engineering, 9th ed. Cengage — Ch. 10–11 (stress increase, consolidation settlement, time rate).
- Steinbrenner, W. (1934). Tafeln zur Setzungsberechnung. Die Strasse, 1, 121–124.
- Terzaghi, K. (1943). Theoretical Soil Mechanics. Wiley.
- Duncan, J.M. & Buchignani, A.L. (1976). An engineering manual for settlement studies. University of California, Berkeley.
- Kulhawy, F.H. & Mayne, P.W. (1990). Manual on Estimating Soil Properties for Foundation Design. EPRI EL-6800.
From theory to your own design
Find the total settlement of your own foundation in minutes
- The immediate, the consolidation and the total settlement
- The settlement of every layer, at the centre, at the corner and for a rigid foundation
- The settlement–time curve and colour bands of stress, strain and settlement
- A clean calculation report, saved as a PDF. Online: nothing to install, no dongle, on a phone, a tablet or a PC

PDF